Half-pipes

Rotorua 2025

Auckland 2025

Auckland 2024

Te Awamutu 2024

Auckland 2023

Rotorua 2023

Auckland 2022
Skatelite Surfacing

Auckland 2022

Auckland 2022

Auckland 2022

Cambridge 2022

Papamoa 2022

Auckland 2022

Tauranga 2022

Tauranga 2021

Auckland 2021

Auckland 2021

Auckland 2021

Rotorua
2021

May 2021
Hamilton
Reused customers skatelite from old ramp

March 2021
Auckland

Feb 2021
Raglan

Jan 2021
Auckland

Jan 2021
Hamilton

Dec 2020
Piha

Dec 2020
Hauraki

sept 2020
Tauranga

Nov 2020
Western Springs
Owner built Foundations

Swanson
Sept 2020

Sept 2020
Sandringham
Murawai 2020
Torbay 2020
Feb 2020 3foot 2sheet
Feb 2020 3Foot 2.5Sheet
2Foot 2.4M Wide
3Foot 3M Wide
2Foot 3.3mWide
3.5 Foot 3.6M Wide 4-1/4Foot extension
Skatelite Pro Surfacing
Takapuna Jan 2018 Owner Built Foundation
2017

3Foot 3Sheet

Papamoa 2017
Skatelite Pro
Waiheke 2016

Wellington 2016

2016

2016

100% treated mini ramp built in east Auckland with thicker transitional Ply.

100% Treated ramp thats great ramp for height restrictions or the younger generation
Make space for your halfpipe where ever you can. This hidden bush gem came complete on foundation including to basic handrails.
Fully treated halfpipe including skatelite surface basic handrails and subframe foundation
Fully treated halfpipe including a subframe foundation
Fully Treated Halfpipe Including a suframe foundation

Fully Treated Halfpipe Built In Hamilton
Fully treated Halfpipe built in the coromandle
Fully treated halfpipe Including foundation at a height of 2.7 foot including a 1 sheet extension at 3.7 foot
Fully treated Halfpipe Including a subframe foundation and Basic Handrails
100% treated Halfpipe Including the cost of a subframe foundation.
Extra foundation charge requiered if building on uneven surface

100% Treated halfpipe built on site as new in Taranaki.
