Half-pipes
Auckland 2023
Rotorua 2023
Auckland 2022
Skatelite Surfacing
Auckland 2022
Auckland 2022
Auckland 2022
Cambridge 2022
Papamoa 2022
Auckland 2022
Tauranga 2022
Tauranga 2021
Auckland 2021
Auckland 2021
Auckland 2021
Rotorua
2021
May 2021
Hamilton
Reused customers skatelite from old ramp
March 2021
Auckland
Feb 2021
Raglan
Jan 2021
Auckland
Jan 2021
Hamilton
Dec 2020
Piha
Dec 2020
Hauraki
sept 2020
Tauranga
Nov 2020
Western Springs
Owner built Foundations
Swanson
Sept 2020
Sept 2020
Sandringham
Murawai 2020
Torbay 2020
Feb 2020 3foot 2sheet
Feb 2020 3Foot 2.5Sheet
2Foot 2.4M Wide
3Foot 3M Wide
2Foot 3.3mWide
3.5 Foot 3.6M Wide 4-1/4Foot extension
Skatelite Pro Surfacing
Takapuna Jan 2018 Owner Built Foundation
2017
3Foot 3Sheet
Papamoa 2017
Skatelite Pro
Waiheke 2016
Wellington 2016
2016
2016
100% treated mini ramp built in east Auckland with thicker transitional Ply.
100% Treated ramp thats great ramp for height restrictions or the younger generation
Make space for your halfpipe where ever you can. This hidden bush gem came complete on foundation including to basic handrails.
Fully treated halfpipe including skatelite surface basic handrails and subframe foundation
Fully treated halfpipe including a subframe foundation
Fully Treated Halfpipe Including a suframe foundation
Fully Treated Halfpipe Built In Hamilton
Fully treated Halfpipe built in the coromandle
Fully treated halfpipe Including foundation at a height of 2.7 foot including a 1 sheet extension at 3.7 foot
Fully treated Halfpipe Including a subframe foundation and Basic Handrails
100% treated Halfpipe Including the cost of a subframe foundation.
Extra foundation charge requiered if building on uneven surface
100% Treated halfpipe built on site as new in Taranaki.